Wellcome to National Portal
Main Comtent Skiped

প্রকল্প

 

 

BTCL Projects

Ongoing and Planned Projects

#

Name of Project

Fund (BTCL own fund/ ADP)
(ADP-Annual Development Program of Goveernment of Bangladesh(GoB))

Project Implementation Period & Cost of the Project (In Lac Taka)

Major Component  (Scope of the Project)

1

Telecommunication Network Development Project (TNDP)

 

Contact:  AGM, TNDP

Phone: 9102712

GoB + JICA, Japan

Period : 1 Jul 2009-30 Jun 2013

Extended to: 30 June 2015

 

Cost : GoB : 11350.72

             P.A : 50935.53

                   Total : 62286.25

 

1. NGN (IMS) based Telecommunication System with IN & Access Gateway

2. International Gateway Exchange (IGW)

3. National Transmission Backbone OFC Network 1400 km, SDH M/W link

4. Access Facilities-FTTX

5. Wireless Access-WLL

6. ADSL & DSLAM

7. 24/7 National Operation Center (NoC)

2

Optical Fibre Cable Network development in 1000 Union Parishad (1006 Union Parishad)

 

Contact: Project Director, OFCNDP in 1000 UP

Phone: 9320258

 

 

 

Project Summary (12Nov2014)

 

 

GoB

Period : 1 Jan 2012-30 Jun 2014

Extended to 30 Jun 2016

 

Local Currency : 49088.29

Revised: 56824.02

Foreign Currency : 22818.15

Revised: 15073.07

       Total Cost : 71906.44

       Revised: 71807.09

                     (GoB Fund, Equity)

 

1. Transmission equipment :

STM16 & STM1 Mux

2. a) OFC Network from Upazila to Union (11060 km)

b) OFC Network Accessories

3. Balancing equipment (M/W, SDH Link, Sever ports etc.)

 

3Optical Fiber Cable Network development at Upazila level (290 Upazilla)GoB

 

Period : 1 Jan 2013-30 Jun 2016

 

Local Currency : 40470.48

Foreign Currency :9457.66

 

       Total Cost : 49928.14

 

1. Transmission equipment :

STM-64 & STM16 Mux

2. a) OFC Network from Upazila to District (48 core): 8220 km

b) OFC Network Accessories

 

4Installation of Wireless Broadband network for Digital Bangladesh (4G, LTE)GoB+EDCF

Period : 01 May 2014-30 Jun 2017

 

 

Foreign Currency :56740.57

Local Currency : 18191.03  

       Total Cost : 74931.60

1. Core Network MME

2. eNode-B BTS at all metropolitan cities, District HQ, Upazila and growth centers

3. NMS & IN

4. CPE about 10,000 set

5. Transmission equipment to connect all BTS with ASN

6. Optical fiber-300 km